Subject: Re: GC master agreements

Message:

(read message guidelines).
Note: Do not use the below fields to advertise your business - only for links related to the discussion.
Thread Related Link URL:
Thread Related Link Title:
  To "point" to an image (picture) from another website, provide the URL (Web Address) of the file ( include ONE reference to http:// )
Thread Related Image URL:

Date of your Birth:

Upload a Thread Related File:
File Types: Image (gif-jpg-png-bmp), PDF, Sketchup, Video (mov avi wmv mpeg mpg mp4 ogg). (Image Upload Tips)

I have read the Site User Agreement and agree with the Terms

  <= Check to receive e-mail notification of responses

Message Thread:

GC master agreements

3/5/20       
Chris

we are a small 2 man shop that mainly does high end custom work. We outsource doors and drawers and finishing. We have worked for some larger builders and each have their "master agreements". Ive just received one from a new to us builder. It's 13 pages long.
The one thing all of these master agreements have in common that I see is that they state something to the effect of that the master agreement voids any other agreements etc etc. Perhaps we should let this go and work with companies that have faces.

3/5/20       #2: GC master agreements ...
Alan F.

They want a uniform agreement with all their subs, it probably voids the prior master agreement.

Focus on the key issues
Payment
Insurance
Liquidated Damages
Waivers of subrogation ( if you have to pay for them now then add the cost to the bids) Some insurance waivers can be prohibitive.

In commercial work we are generally bound to the contract between the owner and GC even though we don't always see it.

The only time the fine print matters is when things go south on a job or warranty.

There is risk to terms of contracts, your price needs to account for the risk, ie a 2 year warranty instead of a 1 year warranty.
A-

3/5/20       #3: GC master agreements ...
Chris

Thanks Alan. That helps. What are liquidated damages?

3/5/20       #4: GC master agreements ...
Alan F.

Liquidated damages are a preset fee if you are late on the job.

This is from a job we bid the other day

9. Compensable delays and liquidated damages are pre-established for the amounts of $1,597 and $2,000 per day, respectively.

You should stay away from jobs with damages. You shouldn't see them in homes but if you do you really need to document every delay and send a cost impact to work OT.

Damages can create an adversarial relationship and we prefer to work as part of a team, its hard to be part of a team if some of the members fall behind and cause you to be late.

A-

3/5/20       #5: GC master agreements ...
Chris

Wow, thanks so much Alan. I haven’t posted in a while but now I remember what a valuable asset this site has been over the years. I really appreciate it

3/6/20       #6: GC master agreements ...
james e mcgrew  Member

Website: mcgrewwoodwork.com

Most if not all delays are caused far in advance of site ready for Cabinetry, If you are in a LD contract Document everything with an email or some defensible form.

We photo conditions on every site visit.

3/6/20       #7: GC master agreements ...
Alan F. Member

James,
We had a bid last year where we had to use their bid form and agree to the schedule. Lots of curved window trim in plan and sills, two and three stories above the lobby floor so lots of lift and scaffold work. LD were $2000 per day, we had 20 days of install (x 6 men) so I carried 47k in LD in my bid.

The contractor wanted to know why our price went up so much and I told him give us more than 3 days to install the project or plan on me being late and paying LD.

I gave them an 40k deduct if they adjusted the schedule prior to awarding the contract. In the end, all the trim went away because they were over budget. The trim was all clear VG fir.

Sometimes we just need to plan on having to pay LD at time of bid.

A-

3/6/20       #8: GC master agreements ...
Chris

Awesome Alan! Well done

3/6/20       #9: GC master agreements ...
Pat Gilbert

Why is LD not a two way street?

3/6/20       #10: GC master agreements ...
Alan F. Member

Pat,
Its not usually but it can be.
It pretty much went away in CA when the pay if paid went away because the lawsuit on the contract that ended pay if paid was structured to never pay the subs, pay the GC and bonus him at the front end of the project.
I think it was a former MGM exec that did the deal for a building in LA.

In the late 70's and early 80's I was building office buildings.
Because interest was so high buyers wanted us to complete the projects faster to reduce the interest on their construction loans that were 14-18%.

The owner of the development company structured contracts for 10 month completion dates from when we had a permit we were penalized after 10 months and rewarded if we completed in 9 months or less with each month being more money (less interest, building ready to rent).

He split the bonuses between all employees and some subs.

The structure was
Owner %
Office Manager percentage
PM percentage (me)
Project PM percentage
Office help.
TI PM percentage
Sub %

One year I was responsible directly for two buildings so I got the PM and project PM bonus, and the PM bonus on 5 other buildings. I had some good years and everybody was motivated to get projects done. We worked hard and I worked a lot of weekends but I was well paid.

I needed to shovel snow off the roof one Sunday and one of the women in the office got me about 10 HS seniors that were friends of here son to shovel snow off the roof. It was done in two hours.

We did job last year where we received an additive change order for a fair sum of money and I called and asked the PM what was going on and he was rewarding the subs that helped get the project done on-time because they made more than they expected.

All we can do in LD projects is assess the schedule and be prepared to document everything (higher PM cost), change order everything that takes time away without compensation. That's why we stay away from those jobs, you basically need to fight the GC or owner or ARCH or other subs for every delay.

3/7/20       #11: GC master agreements ...
Pat Gilbert

My experience is similiar with the LD, the last one had endless complications because of GC incompetence that we finished at 3:00 am and made the schedule only to have the store owner declare bankruptcy.

3/14/20       #12: GC master agreements ...
Larry K Schweitzer

We won't sign contracts with the no pay if the GC doesn't get paid clauses. Yes we lose some jobs because of that but we have no control over who the GC choses to do business with. If you feel you have to do it, make sure you get paid for the risk factor. I've had GCs agree to eliminate that clause from our agreements. Ask. Watch out for developers that form a new corporation for each project, big red flag, high risk. Been there and got burned.

3/15/20       #13: GC master agreements ...
Pat Gilbert

There are two other clauses that make up the do not sign the contract maxim. (not that I remember what they are)

Contractors operate on a 4% to 20% margin, they can string out their subs for a long time before they are forced into bankruptcy.

Be careful who you do business with

3/15/20       #14: GC master agreements ...
Alan F. Member

Pay -if paid is or wasn't enforcable in California.

As a sub you should ask then to provide the complimntary piece of what they ask you to provide if required, 100% payment bond.

Tell them you are fine to take the risk as long as thier bonding company guarantees payment.

We did a public works job in 2009 where the GC went belly up before the end of the job, we filed a claim with the bond company and were paid in about 15 days.

Pay - if paid

9/16/20       #15: GC master agreements ...
d conti Member

We just finished a large job for a national contractor in Nashville. We were installing owner supplied cabinets. The GC kept having calling us to install when they were not ready to install. Well when I dug into it it was the supers and PM bonus were tied into making dates on the contruction schedule. The were also LD damages on this job. Well everytime we went to install and could not complete a unit I documented it and e-mailed to the senoir Project Manager and cc everyone else. He finally got quite upset with me and told me to stop sending him emails of what we can't do. He knew what I was doing, documenting where and when I was held up by the building not being ready for cabinet installation, this way they could not charge me for LD on those occasions.
I just told him that this was not my first rodeo and I would not be charged for things that were not my fault. We never did get along but I also did not have and LD on that job all though many other subs did.

 

Buy & Sell Exchanges | Forums | Galleries | Site Map

FORUM GUIDELINES: Please review the guidelines below before posting at WOODWEB's Interactive Message Boards (return to top)

  • WOODWEB is a professional industrial woodworking site. Hobbyist and homeowner woodworking questions are inappropriate.
  • Messages should be kept reasonably short and on topic, relating to the focus of the forum. Responses should relate to the original question.
  • A valid email return address must be included with each message.
  • Advertising is inappropriate. The only exceptions are the Classified Ads Exchange, Machinery Exchange, Lumber Exchange, and Job Opportunities and Services Exchange. When posting listings in these areas, review the posting instructions carefully.
  • Subject lines may be edited for length and clarity.
  • "Cross posting" is not permitted. Choose the best forum for your question, and post your question at one forum only.
  • Messages requesting private responses will be removed - Forums are designed to provide information and assistance for all of our visitors. Private response requests are appropriate at WOODWEB's Exchanges and Job Opportunities and Services.
  • Messages that accuse businesses or individuals of alleged negative actions or behavior are inappropriate since WOODWEB is unable to verify or substantiate the claims.
  • Posts with the intent of soliciting answers to surveys are not appropriate. Contact WOODWEB for more information on initiating a survey.
  • Excessive forum participation by an individual upsets the balance of a healthy forum atmosphere. Individuals who excessively post responses containing marginal content will be considered repeat forum abusers.
  • Responses that initiate or support inappropriate and off-topic discussion of general politics detract from the professional woodworking focus of WOODWEB, and will be removed.
  • Participants are encouraged to use their real name when posting. Intentionally using another persons name is prohibited, and posts of this nature will be removed at WOODWEB's discretion.
  • Comments, questions, or criticisms regarding Forum policies should be directed to WOODWEB's Systems Administrator
    (return to top).

    Carefully review your message before clicking on the "Send Message" button - you will not be able to revise the message once it has been sent.

    You will be notified of responses to the message(s) you posted via email. Be sure to enter your email address correctly.

    WOODWEB's forums are a highly regarded resource for professional woodworkers. Messages and responses that are crafted in a professional and civil manner strengthen this resource. Messages that do not reflect a professional tone reduce the value of our forums.

    Messages are inappropriate when their content: is deemed libelous in nature or is based on rumor, fails to meet basic standards of decorum, contains blatant advertising or inappropriate emphasis on self promotion (return to top).

    Libel:   Posts which defame an individual or organization, or employ a tone which can be viewed as malicious in nature. Words, pictures, or cartoons which expose a person or organization to public hatred, shame, disgrace, or ridicule, or induce an ill opinion of a person or organization, are libelous.

    Improper Decorum:   Posts which are profane, inciting, disrespectful or uncivil in tone, or maliciously worded. This also includes the venting of unsubstantiated opinions. Such messages do little to illuminate a given topic, and often have the opposite effect. Constructive criticism is acceptable (return to top).

    Advertising:   The purpose of WOODWEB Forums is to provide answers, not an advertising venue. Companies participating in a Forum discussion should provide specific answers to posted questions. WOODWEB suggests that businesses include an appropriately crafted signature in order to identify their company. A well meaning post that seems to be on-topic but contains a product reference may do your business more harm than good in the Forum environment. Forum users may perceive your references to specific products as unsolicited advertising (spam) and consciously avoid your web site or services. A well-crafted signature is an appropriate way to advertise your services that will not offend potential customers. Signatures should be limited to 4-6 lines, and may contain information that identifies the type of business you're in, your URL and email address (return to top).

    Repeated Forum Abuse: Forum participants who repeatedly fail to follow WOODWEB's Forum Guidelines may encounter difficulty when attempting to post messages.

    There are often situations when the original message asks for opinions: "What is the best widget for my type of shop?". To a certain extent, the person posting the message is responsible for including specific questions within the message. An open ended question (like the one above) invites responses that may read as sales pitches. WOODWEB suggests that companies responding to such a question provide detailed and substantive replies rather than responses that read as a one-sided product promotion. It has been WOODWEB's experience that substantive responses are held in higher regard by our readers (return to top).

    The staff of WOODWEB assume no responsibility for the accuracy, content, or outcome of any posting transmitted at WOODWEB's Message Boards. Participants should undertake the use of machinery, materials and methods discussed at WOODWEB's Message Boards after considerate evaluation, and at their own risk. WOODWEB reserves the right to delete any messages it deems inappropriate. (return to top)


  • Forum Posting Help
    Your Name The name you enter in this field will be the name that appears with your post or response (return to form).
    Your Website Personal or business website links must point to the author's website. Inappropriate links will be removed without notice, and at WOODWEB's sole discretion. WOODWEB reserves the right to delete any messages with links it deems inappropriate. (return to form)
    E-Mail Address Your e-mail address will not be publicly viewable. Forum participants will be able to contact you using a contact link (included with your post) that is substituted for your actual address. You must include a valid email address in this field. (return to form)
    Subject Subject may be edited for length and clarity. Subject lines should provide an indication of the content of your post. (return to form)
    Thread Related Link and Image Guidelines Thread Related Links posted at WOODWEB's Forums and Exchanges should point to locations that provide supporting information for the topic being discussed in the current message thread. The purpose of WOODWEB Forums is to provide answers, not to serve as an advertising venue. A Thread Related Link that directs visitors to an area with inappropriate content will be removed. WOODWEB reserves the right to delete any messages with links or images it deems inappropriate. (return to form)
    Thread Related File Uploads Thread Related Files posted at WOODWEB's Forums and Exchanges should provide supporting information for the topic being discussed in the current message thread. Video Files: acceptable video formats are: .MOV .AVI .WMV .MPEG .MPG .MP4 (Image Upload Tips)   If you encounter any difficulty when uploading video files, E-mail WOODWEB for assistance. The purpose of WOODWEB Forums is to provide answers, not to serve as an advertising venue. A Thread Related File that contains inappropriate content will be removed, and uploaded files that are not directly related to the message thread will be removed. WOODWEB reserves the right to delete any messages with links, files, or images it deems inappropriate. (return to form)
    Sponsors
    • ULTI-BOARD
      The Ultimate Spoilboard - ULTI-BOARD - Specifically Engineered and Formulated for the Ultimate in Spoilboard Performance - Not Your Ordinary Sheet of MDF.
    • WoodJobs.com Search Consultants
      Free Employment Service for Woodworking Related Job Seekers
    • Parts Cutter CNC
      CNC Cabinetry and Closet Parts
    • Vexor Custom Woodworking Tools, Inc.
      Custom and Standard Router Bits, Shaper Cutters, Profile Knives, Multi Profile Insert Tooling and More
    • Cabinetshop Maestro
      Web-Based Project Management Software for Custom Cabinet Shops - Manage Jobs from Prospect to Punchlist Through Scheduling, Task Management, Time Tracking and Communication
    • TradeSoft
      Seamless Management Software to Improve Estimating, Job Costing, Scheduling, Purchasing, Shipping, and Shop Floor Data Collection
    • OMEC/Macoser Inc
      Exclusive Importer of European Woodworking Machinery Since 1988
    • Better Vacuum Cups, Inc.
      Vacuum Cups for All CNC Routers As Well As Many After Market Parts for Your CNC
    • Rangate
      Woodworking Machinery, Supplies and Knowledge
    • TradeJobPlacement.com
      Individualized Placement Services, Specializing in Millwork Design Engineers
    • Air Handling Systems
      Your Best Source for Dust and Fume Collection
    • NEMI
      Products For CNC Machines - Digitizers, Tool Setters, Vacuum Pods, Vacuum Cups, Vacuum Tables, Vacuum Chucks and Software
    • Impact Search and Placement
      Professional Employment Recruiting Specialists

    Become a Sponsor today!